Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

383

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other basic organic chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0632 #14 Y:2025 Improve space comfort conditioning $1,115 $3,888
UF0632 #13 Y:2025 Level one – add communication using iiot devices to existing control system to modify operations $1,094 -
UF0632 #12 Y:2025 Level zero – install control systems for existing equipment $7,429 $20,000
UF0632 #11 Y:2025 Use reverse osmosis to concentrate material $3,839 $3,079
UF0632 #10 Y:2025 Install de-aerator in place of condensate tank $2,684 $2,743
UF0632 #09 Y:2025 Install turbulators $2,277 $3,750
UF0632 #08 Y:2025 Reduce the pressure of compressed air to the minimum required $4,170 $2,654
UF0632 #07 Y:2025 Minimize condenser cooling water temperature $4,170 $6,785
UF0632 #06 Y:2025 Improve combustion control capability $4,200 $2,000
UF0632 #05 Y:2025 Utilize controls to operate equipment only when needed $5,526 $20,560
UF0632 #04 Y:2025 Use waste heat from hot flue gases to preheat $12,726 $12,000
UF0632 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $16,911 $34,076
UF0632 #02 Y:2025 Use demand controller or load shedder $21,772 $20,202
UF0632 #01 Y:2025 Use solar heat to make electricty $43,631 $322,608
UC2419 #09 Y:2024 Use solar heat to make electricty $54,471 $776,252
UC2419 #08 Y:2024 Reduce the pressure of compressed air to the minimum required $436 $75
UC2419 #07 Y:2024 Install timers and/or thermostats $149 $390
UC2419 #06 Y:2024 Insulate bare equipment $22,646 $4,752
UC2419 #05 Y:2024 Install / repair insulation on steam lines $7,234 $1,183
UC2419 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,510 $2,929