Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other basic inorganic chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0589 #07 Y:2024 Replace existing hvac unit with high efficiency model $4,206 $19,974
LE0589 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,173 $4,403
LE0589 #05 Y:2024 Preheat combustion air with waste heat $1,588 $5,000
LE0589 #04 Y:2024 Install occupancy sensors $651 $1,275
LE0589 #03 Y:2024 Install timers and/or thermostats $1,179 $800
LE0589 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $6,428 $3,300
LE0589 #01 Y:2024 Install back-up equipment $125,769 $50,000
UU0258 #08 Y:2024 Change rate schedules or other changes in utility service $180,000 $20,000
UU0258 #07 Y:2024 Optimize plant power factor $120,000 $198,000
UU0258 #06 Y:2024 Install compressor air intakes in coolest locations $2,570 $5,140
UU0258 #05 Y:2024 Eliminate or reduce compressed air usage $7,890 $11,500
UU0258 #04 Y:2024 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,690,000 $23,500,000
UU0258 #03 Y:2024 Improve combustion control capability $12,600 $54,500
UU0258 #02 Y:2024 Install / repair insulation on steam lines $25,800 $6,200
UU0258 #01 Y:2024 Install smaller boiler (increase high fire duty cycle) $158,000 $725,000
LS2406 #04 Y:2024 Use most efficient type of electric motors $2,460 $11,500
LS2406 #03 Y:2024 Add/modify equipment to improve drying process $9,410 $28,500
LS2406 #02 Y:2024 Utilize energy-efficient belts and other improved mechanisms $3,468 $750
LS2406 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $1,003 $50
KS2321 #08 Y:2023 Eliminate leaks in water lines and valves $29,979 $30