Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

703

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Pulp, paper, and paperboard mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0590 #12 Y:2024 Analyze flue gas for proper air/fuel ratio $4,407 $29,000
LE0590 #11 Y:2024 Use most efficient type of electric motors $173,183 $1,591,750
LE0590 #10 Y:2024 Replace existing hvac unit with high efficiency model $9,004 $30,293
LE0590 #09 Y:2024 Replace boiler $109,410 $550,000
LE0590 #08 Y:2024 Re-use or recycle hot or cold process exhaust air $3,163 $4,000
LE0590 #07 Y:2024 Install compressor air intakes in coolest locations $4,163 $4,000
LE0590 #06 Y:2024 Use solar heat to heat water $58,205 $636,222
LE0590 #05 Y:2024 Eliminate a by-product $24,310 $16,420
LE0590 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,020 $3,696
LE0590 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $7,450 $1,980
LE0590 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,681 $301
LE0590 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $5,469 -
NT0037 #05 Y:2024 Apply for investment incentives $94,336 $5,000
NT0037 #04 Y:2024 Lower temperature during the winter season and vice-versa $482 -
NT0037 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $5,316 -
NT0037 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,403 $5,609
NT0037 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $577 $1,901
LE0583 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $9,189 $49,500
LE0583 #06 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,627,510 $8,755,000
LE0583 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $27,716 $10,250