Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other textile product mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2419 #05 Y:2024 Use solar heat to make electricty $38,616 $514,800
LS2419 #04 Y:2024 Upgrade obsolete equipment $56,850 $580,000
LS2419 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $7,609 $51,689
LS2419 #02 Y:2024 Use other waste concentration methods $50,241 $154,466
LS2419 #01 Y:2024 Improve space comfort conditioning $6,299 $17,640
AM0881 #07 Y:2023 Utilize energy-efficient belts and other improved mechanisms $650 $610
AM0881 #06 Y:2023 Make a practice of turning off lights when not needed $730 $500
AM0881 #05 Y:2023 Install occupancy sensors $1,200 $425
AM0881 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,265 $3,080
AM0881 #03 Y:2023 Optimize plant power factor $4,840 $6,780
AM0881 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $6,050 $1,000
AM0881 #01 Y:2023 Apply for tax-free status for energy purchases $22,165 -
UW2301 #05 Y:2023 Use most efficient type of electric motors $13,590 $77,405
UW2301 #04 Y:2023 Reduce the pressure of compressed air to the minimum required $729 -
UW2301 #03 Y:2023 Install compressor air intakes in coolest locations $1,976 $295
UW2301 #02 Y:2023 Install occupancy sensors $82 $344
UW2301 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $7,523 $16,133
LE0541 #06 Y:2023 Replace existing hvac unit with high efficiency model $1,586 $8,304
LE0541 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,345 $4,836
LE0541 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $890 $2,400