Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Broadwoven fabric mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CL2105 #11 Y:2021 Use flow control valves on equipment to optimize water use $982 $3,050
CL2105 #10 Y:2021 Replace treated water with well / surface water $2,591 $600
CL2105 #09 Y:2021 Install waste heat boiler to provide direct power $24,497 $17,450
CL2105 #08 Y:2021 Utilize energy-efficient belts and other improved mechanisms $25,046 $7,102
CL2105 #07 Y:2021 Use optimum temperature $81,375 -
CL2105 #06 Y:2021 Keep doors and windows shut when not on use $63 -
CL2105 #05 Y:2021 Use solar heat to make electricty $567,975 $4,358,847
CL2105 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $23,819 $2,100
CL2105 #03 Y:2021 Reschedule plant operations or reduce load to avoid peaks $34,939 $1,120
CL2105 #02 Y:2021 Install occupancy sensors $25,163 $8,200
CL2105 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $69,993 $55,908
NC0613 #09 Y:2018 Develop a repair/replace policy $2,479 $5,865
NC0613 #08 Y:2018 Install spectral reflectors / delamp $914 $1,700
NC0613 #07 Y:2018 Change rate schedules or other changes in utility service $27,242 $500
NC0613 #06 Y:2018 Change rate schedules or other changes in utility service $2,218 $500
NC0613 #05 Y:2018 Recover and reuse cooling water $6,422 $1,500
NC0613 #04 Y:2018 Eliminate or reduce compressed air usage $1,751 $2,700
NC0613 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $14,628 $200
NC0613 #02 Y:2018 Install occupancy sensors $698 $5,976
NC0613 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $27,956 $81,978