Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ice cream and frozen dessert manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0640 #11 Y:2025 Improve space comfort conditioning $31,352 $6,210
UF0640 #10 Y:2025 Install refrigeration system to cool product $76,474 $55,000
UF0640 #09 Y:2025 Eliminate leaks in water lines and valves $6,235 $2,204
UF0640 #08 Y:2025 Meter recycled water (to reduce sewer charges) $40,788 $5,352
UF0640 #07 Y:2025 Install turbulators $747 $3,000
UF0640 #06 Y:2025 Improve combustion control capability $868 $1,400
UF0640 #05 Y:2025 Increase amount of condensate returned $1,007 $1,670
UF0640 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,691 -
UF0640 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $1,993 -
UF0640 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,193 $360
UF0640 #01 Y:2025 Use demand controller or load shedder $13,290 $8,730
CI0032 #09 Y:2024 Use most efficient type of electric motors $454 $1,050
CI0032 #08 Y:2024 Install occupancy sensors $1,100 $2,025
CI0032 #07 Y:2024 Recharge batteries on during off-peak demand periods $1,346 $100
CI0032 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $4,536 $22,885
CI0032 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $5,401 -
CI0032 #04 Y:2024 Insulate glazing, walls, ceilings, and roofs $8,168 $13,563
CI0032 #03 Y:2024 Install vinyl strip / high speed / air curtain doors $9,326 $24,000
CI0032 #02 Y:2024 Insulate bare equipment $10,726 $2,419
CI0032 #01 Y:2024 Use solar heat to make electricty $47,412 $313,000