1,459
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0279 #07 Y:2025 | 07 | 2025 | Use solar heat to make electricty | $49,660 | $460,010 |
n/a
|
UU0279 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,760 | $1,400 |
n/a
|
UU0279 #05 Y:2025 | 05 | 2025 | Insulate bare equipment | $1,050 | $2,860 |
n/a
|
UU0279 #04 Y:2025 | 04 | 2025 | Reduce hot water temperature to the minimum required | $8,900 | $4,720 |
n/a
|
UU0279 #03 Y:2025 | 03 | 2025 | Repair and eliminate steam leaks | $5,400 | $15,580 |
n/a
|
UU0279 #02 Y:2025 | 02 | 2025 | Replace fossil fuel equipment with electrical equipment | $119,920 | $620,000 |
n/a
|
UU0279 #01 Y:2025 | 01 | 2025 | Purchase gas directly from a contract gas supplier | $92,200 | $14,000 |
n/a
|
DL0259 #05 Y:2025 | 05 | 2025 | Use heat in flue gases to preheat products or materials | $10,050 | $40,000 |
n/a
|
DL0259 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,217 | $5,500 |
n/a
|
DL0259 #03 Y:2025 | 03 | 2025 | Use heat from boiler blowdown to preheat boiler feed water | $3,091 | $13,000 |
n/a
|
DL0259 #02 Y:2025 | 02 | 2025 | Recover waste heat from equipment | $11,620 | $30,000 |
n/a
|
DL0259 #01 Y:2025 | 01 | 2025 | Change procedures / equipment / operating conditions | $45,458 | $19,000 |
n/a
|
CI0042 #10 Y:2024 | 10 | 2024 | Recharge batteries on during off-peak demand periods | $2,862 | $6,000 |
n/a
|
CI0042 #09 Y:2024 | 09 | 2024 | Install compressor air intakes in coolest locations | $4,050 | $6,000 |
n/a
|
CI0042 #08 Y:2024 | 08 | 2024 | Utilize higher efficiency lamps and/or ballasts | $4,561 | $4,560 |
n/a
|
CI0042 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $8,210 | $2,325 |
n/a
|
CI0042 #06 Y:2024 | 06 | 2024 | Use most efficient type of electric motors | $16,424 | $4,950 |
n/a
|
CI0042 #05 Y:2024 | 05 | 2024 | Replace existing hvac unit with high efficiency model | $17,797 | $90,000 |
n/a
|
CI0042 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $33,610 | $14,000 |
n/a
|
CI0042 #03 Y:2024 | 03 | 2024 | Replace existing chiller with high efficiency model | $44,001 | $25,000 |
n/a
|