Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

559

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1042 #01 Y:2022 Utilize energy-efficient belts and other improved mechanisms $15,033 -
UU0195 #09 Y:2021 Reduce the pressure of compressed air to the minimum required $883 $1,000
UU0195 #08 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,777 $3,908
UU0195 #07 Y:2021 Install occupancy sensors $1,910 $3,500
UU0195 #06 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,050 $218
UU0195 #05 Y:2021 Insulate bare equipment $3,620 $7,340
UU0195 #04 Y:2021 Optimize plant power factor $4,698 $20,000
UU0195 #03 Y:2021 Change rate schedules or other changes in utility service $5,645 $2,000
UU0195 #02 Y:2021 Analyze flue gas for proper air/fuel ratio $11,177 $25,216
UU0195 #01 Y:2021 Purchase gas directly from a contract gas supplier $13,680 $22,600
UU0187 #04 Y:2021 Analyze flue gas for proper air/fuel ratio $750 $870
UU0187 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $735 $1,470
UU0187 #02 Y:2021 Change rate schedules or other changes in utility service $1,910 $10,200
UU0187 #01 Y:2021 Optimize plant power factor $9,400 $14,500
OK1047 #04 Y:2021 Replace existing hvac unit with high efficiency model $876 $500
OK1047 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $5,212 $1,242
OK1047 #02 Y:2021 Utilize higher efficiency lamps and/or ballasts $5,774 $6,045
OK1047 #01 Y:2021 Use most efficient type of electric motors $9,181 $17,737
UU0180 #09 Y:2021 Reduce the pressure of compressed air to the minimum required $323 $227
UU0180 #08 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $425 $815