Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Animal production and aquaculture
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0392 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,327 $5,642
SF0411 #12 Y:2012 Utilize higher efficiency lamps and/or ballasts $33,986 $135,330
SF0411 #11 Y:2012 Replace existing chiller with high efficiency model $1,227 $3,774
SF0411 #10 Y:2012 Install occupancy sensors $18,497 $47,901
SF0411 #09 Y:2012 Use waste heat from hot flue gases to preheat $4,671 $11,216
SF0411 #08 Y:2012 Recover waste heat from equipment $2,723 $3,965
SF0411 #07 Y:2012 Use multiple-effect evaporators $14,245 $17,433
SF0411 #06 Y:2012 Use or replace with energy efficient substitutes $1,094 $939
SF0411 #05 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $19,104 $6,660
SF0411 #04 Y:2012 Analyze flue gas for proper air/fuel ratio $1,666 $1,200
SF0411 #03 Y:2012 Schedule use of elevators to conserve energy $716 -
SF0411 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $3,097 $504
SF0411 #01 Y:2012 Combine utility meters $35,266 -
OR0576 #03 Y:2011 Use solar heat to make electricty $764 $4,960
OR0576 #02 Y:2011 Use hot process fluids to preheat incoming process fluids $109,290 $104,251
OR0576 #01 Y:2011 Reduce combustion air flow to optimum $10,860 $1,000
UW0031 #04 Y:2009 Insulate bare equipment $144 $61
UW0031 #03 Y:2009 Insulate bare equipment $1,741 $5,500
UW0031 #02 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $13,305 $6,000
UW0031 #01 Y:2009 Use most efficient type of electric motors $13,928 $19,446