Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91 matching assessments
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Iron and steel forgings
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
TR0061 2024 Stamped metal parts 5 $153k $150k
WM0230 2024 Forged steel components 4 $1,555k $161k
WV0640 2023 Iron and steel forging 12 $2,532k $330k
UL2207 2022 Metal industrial components 7 $4,302k $376k
AM0825 2021 Steel forgings 5 $1,367k $34k
TR0020 2019 Stamped metal parts 6 $106k $54k
IC0225 2019 Forged metal products 7 $1,238k $96k
WV0584 2019 Open-die forged products 11 $4,862k $722k
WM0135 2019 Forged steel components 14 $1,225k $150k
LE0468 2018 Large forgings 6 $3,475k $995k
WV0556 2017 Iron and steel forging 14 $988k $139k
MZ0236 2017 Hot forged and heat-treated steel grinding balls 5 $2,152k $27k
SU0444 2017 Industrial forging 7 $169k $30k
UK1614 2017 Closed die forgings 9 $1,053k $168k
UM0480 2016 Steering assembly components 4 $1,166k $50k
IP0075 2016 Steel forgings 7 $3,719k $356k
SD0526 2016 Die forged metals 11 $1,165k $324k
UD0941 2015 Automotive forgings 14 $428k $58k
SD0512 2015 Industrial valves 6 $213k $96k
WM0069 2015 Raw forging 11 $1,494k $340k