Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,493 matching assessments
ARC 2+ Digits Required
NAICS Fabricated metal product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
SF0388 2010 Flat rolled steel 6 $102k $27k
MA0665 2010 Surface finishing by cut-wire peening and vibratory milling of turbine a 7 $173k $25k
UA0052 2010 Metal fabrication 8 $672k $43k
UD0819 2010 Sinter-forged automotive transmission components 13 $2,003k $310k
DL0050 2010 Sheet metal manufacturing 5 $72k $16k
MA0663 2010 Metalizing and coating services 5 $244k $40k
NC0404 2010 Fabricated steel buildings 4 $208k $10k
WV0406 2010 Galvanized steel 6 $3,418k $280k
BD0375 2010 Asme pressure vessels 10 $86k $33k
LL0328 2010 Tube alloy 6 $277k $45k
AM0577 2010 Pipe threads 12 $155k $69k
UM0367 2010 Specialty coatings 14 $375k $97k
UM0366 2010 Autophoretic coating of parts 5 $261k $13k
BD0374 2010 Welded and formed tube assemblies 11 $518k $111k
BD0371 2010 Steel prodcuts 9 $204k $57k
LL0327 2010 Premium threading and tubular accessories 5 $80k $10k
UD0815 2010 Sheet metal products 13 $54k $19k
NC0401 2010 Saw blades and packaged tool accessories 7 $329k $32k
UD0812 2009 Electric disconnect equipment 15 $2,116k $105k
UA0043 2009 Coatings for aircraft part 7 $521k $30k