Assessment Year | 2021 |
---|---|
Principal Product | Sheet glass |
NAICS | 327211: Flat Glass Manufacturing |
SIC | 3211: Flat Glass |
Sales Range | $1 M to 5M |
# of Employees | 36 |
Plant Area |
100,000
ft2
|
Annual Production | 5,000,000
units
|
Production Hrs. Annual | 2,700
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $13,207 | 295,552 |
kWh
|
$0.045 |
Electricity Demand | $13,760 | 901 |
kW-mo/yr
|
$15.27 |
Electricity Fees | $2,551 | - |
|
- |
Natural Gas | $429,134 | 245,841 |
MMBtu
|
$1.75 |
TOTAL YEARLY COSTS | $458,652 | |||
RECOMMENDED SAVINGS* | $56,692 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,721 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $17,166 | $73,920 |
$(-731.0)
(-16,345)
kWh
|
- |
$17,897
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $11,135 | $10,700 | - | - |
$11,615
-
MMBtu
|
$(-480.0) | |
03 | 2.1221: Replace obsolete burners with more efficient ones | $11,092 | $53,040 | - | - |
$11,092
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $10,812 | $30,758 | - | - |
$10,812
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,713 | $7,054 |
$1,054
23,588
kWh
|
$2,659
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $2,061 | $3,373 |
$778
17,399
kWh
|
$1,283
-
kW-mo/yr
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $536 | $96 |
$215
4,814
kWh
|
$321
-
kW-mo/yr
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $177 | $40 |
$70
1,560
kWh
|
$107
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $56,692 | $178,981 |
$1,386
31,016
kWh
|
$4,370
-
kW-mo/yr
|
$51,416
-
MMBtu
|
$(-480.0) | ||
TOTAL IMPLEMENTED | $24,721 | $44,967 |
$1,063
23,773
kWh
|
$1,711
-
kW-mo/yr
|
$22,427
-
MMBtu
|
$(-480.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs