Assessment Year | 2024 |
---|---|
Principal Product | Ductile Iron |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
156,000
ft2
|
Annual Production | 4,320
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $585,789 | 11,017,818 |
kWh
|
$0.053 | |
Electricity Demand | $315,535 | 29,956 |
kW-mo/yr
|
$10.53 | |
Electricity Fees | $114,617 | - |
|
- | |
Natural Gas | $113,761 | 20,538 |
MMBtu
|
$5.54 | |
Waste Disposal Costs | |||||
Water Usage | $28,772 | 3,733 |
Tgal
|
$7.71 | |
TOTAL YEARLY COSTS | $1,158,474 | ||||
RECOMMENDED SAVINGS* | $69,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $53,598 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $39,768 | $89,840 |
$28,772
542,860
kWh
|
$10,996
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,470 | $20,575 |
$9,091
171,529
kWh
|
$3,379
-
kW-mo/yr
|
- | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $8,180 | - | - | - |
$8,180
-
MMBtu
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,912 | $13,800 |
$4,528
85,434
kWh
|
$1,384
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,668 | $1,750 |
$1,310
24,718
kWh
|
$358
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,360 | $4,980 |
$984
18,548
kWh
|
$376
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $69,358 | $130,945 |
$44,685
843,089
kWh
|
$16,494
-
kW-mo/yr
|
$8,180
-
MMBtu
|
||
TOTAL IMPLEMENTED | $53,598 | $115,395 |
$38,847
732,937
kWh
|
$14,751
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs