ITAC Assessment: WM0200
ITAC logo
ITAC Assessment: WM0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Plastics sheets
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 95,000
ft2
Annual Production 33,000,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,847 6,469,383
kWh
Electricity Demand $148,704 18,588
kW-mo/yr
Electricity Fees $33,588 -
Natural Gas $167,837 25,240
MMBtu
Waste Disposal Costs
Water Usage $3,244 1,291
Tgal
Water Disposal $4,754 1,291
Tgal
TOTAL YEARLY COSTS $628,974
RECOMMENDED SAVINGS* $20,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.2442: Preheat combustion air with waste heat $8,579 $10,000 - - $8,579
-
MMBtu
-
02 2.7231: Use radiant heater for spot heating $4,500 $12,375 - - $4,500
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,827 $3,344 $1,915
45,590
kWh
$912
-
kW-mo/yr
- -
04 2.7211: Clean and maintain refrigerant condensers and towers $1,847 $800 $1,452
34,567
kWh
$395
-
kW-mo/yr
- -
05 3.4116: Meter recycled water (to reduce sewer charges) $1,426 $750 - - - $1,426
-
Tgal
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,252 $1,288 $848
20,201
kWh
$404
-
kW-mo/yr
- -
TOTAL RECOMMENDED $20,431 $28,557 $4,215
100,358
kWh
$1,711
-
kW-mo/yr
$13,079
-
MMBtu
$1,426
-
Tgal
TOTAL IMPLEMENTED $7,352 $6,182 $4,215
100,358
kWh
$1,711
-
kW-mo/yr
- $1,426
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs