ITAC Assessment: WI0523
ITAC logo
ITAC Assessment: WI0523
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product agriculture mixers and spreaders1
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 330
Plant Area 226,180
ft2
Annual Production 3,500
pieces
Production Hrs. Annual 6,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,154 3,717,122
kWh
Electricity Demand $75,772 9,185
kW-mo/yr
Natural Gas $343,282 20,314
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,317

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.424: Improve space comfort conditioning $58,800 $3,000 - - - - $58,800
02 2.7142: Utilize higher efficiency lamps and/or ballasts $27,911 $52,320 $19,586
512,736
kWh
$8,325
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $5,347 $1,000 - - $5,347
-
MMBtu
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,880 - - - - $3,880
-
lb
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,735 $800 $2,735
71,571
kWh
- - - -
06 2.4314: Use synthetic lubricant $1,970 - $806
21,108
kWh
$1,164
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $100,643 $57,120 $23,127
605,415
kWh
$9,489
-
kW-mo/yr
$5,347
-
MMBtu
$3,880
-
lb
$58,800
TOTAL IMPLEMENTED $7,317 $1,000 $806
21,108
kWh
$1,164
-
kW-mo/yr
$5,347
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs