ITAC Assessment: WI0348
ITAC logo
ITAC Assessment: WI0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal Rolled Products
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 60,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 4,850
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,760 719,519
kWh
Electricity Demand $30,649 2,495
kW-mo/yr
Electricity Fees $7,549 -
Natural Gas $23,081 5,826
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 4.452: Eliminate shift $28,000 $40,000 - - - - $28,000 - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,083 - - $13,083
-
kW-mo/yr
- - - - -
03 3.4114: Replace city water with recycled water via cooling tower $4,913 $18,000 $(-377.0)
(-8,792)
kWh
$(-323.0)
-
kW-mo/yr
$6,113
-
Tgal
- $(-500.0) - -
04 4.611: Begin a practice of predictive / preventative maintenance $1,867 $4,200 $207
4,982
kWh
- - - $(-840.0) - $2,500
05 3.7131: Use a rag recycle service $843 - - - - $93
-
lb
- $750 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $756 $142 $514
12,309
kWh
$242
-
kW-mo/yr
- - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $229 $60 $144
3,517
kWh
$85
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $49,691 $62,402 $488
12,016
kWh
$13,087
-
kW-mo/yr
$6,113
-
Tgal
$93
-
lb
$26,660 $750 $2,500
TOTAL IMPLEMENTED $30,096 $44,260 $351
8,499
kWh
$85
-
kW-mo/yr
- - $27,160 - $2,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs