ITAC Assessment: WI0211
ITAC logo
ITAC Assessment: WI0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Prototype Aluminum and Zinc Castings
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 34,000
ft2
Annual Production 180,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,602 977,433
kWh
Natural Gas $99,143 28,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.2511: Insulate bare equipment $6,890 $6,400 $6,890
74,443
kWh
-
02 2.8113: Purchase gas directly from a contract gas supplier $611 $1,162 $611
6,741
kWh
-
03 2.7135: Install occupancy sensors $389 $225 $389
4,103
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,114 $180 $6,114
65,944
kWh
-
05 2.7491: Insulate glazing, walls, ceilings, and roofs $581 $960 $581
6,155
kWh
-
06 2.2511: Insulate bare equipment $361 $50 $361
3,810
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $51,400 $100,000 - $51,400
-
lb
TOTAL RECOMMENDED $66,346 $108,977 $14,946
161,196
kWh
$51,400
-
lb
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs