ITAC Assessment: WI0182
ITAC logo
ITAC Assessment: WI0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Lithographic printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 6,750
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,981 1,542,497
kWh
Natural Gas $12,653 2,463
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,600 $5,042 $6,600
81,477
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $950 $2,400 $950
11,723
kWh
-
03 2.7135: Install occupancy sensors $478 $525 $478
5,862
kWh
-
04 2.8113: Purchase gas directly from a contract gas supplier $5,877 $500 - $5,877
-
MMBtu
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,427 $10,000 $4,427
-
kWh
-
06 2.3132: Recharge batteries on during off-peak demand periods $3,198 - $3,198
-
kWh
-
07 2.7221: Lower temperature during the winter season and vice-versa $269 $400 - $269
-
MMBtu
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $107 - $107
1,465
kWh
-
TOTAL RECOMMENDED $21,906 $18,867 $15,760
100,527
kWh
$6,146
-
MMBtu
TOTAL IMPLEMENTED $9,075 $500 $3,198
-
kWh
$5,877
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs