ITAC Assessment: WI0043
ITAC logo
ITAC Assessment: WI0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CORRUGATED CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 600,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,433 3,147,714
kWh
Natural Gas $164,614 48,932
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $10,215 - $10,215
183,470
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $524 - $524
9,379
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,890 $4,906 $4,890
87,925
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,044 $6,500 $2,751
49,531
kWh
$(-707.0)
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $1,737 - $1,737
31,067
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $8,056 $500 - $8,056
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $18,343 $6,900 - $18,343
-
MMBtu
TOTAL RECOMMENDED $45,809 $18,806 $20,117
361,372
kWh
$25,692
-
MMBtu
TOTAL IMPLEMENTED $35,594 $18,806 $9,902
177,902
kWh
$25,692
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs