| Assessment Year | 1988 |
|---|---|
| Principal Product | CORRUGATED CONTAINERS |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 600,000
thousand feet
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $175,433 | 3,147,714 |
kWh
|
$0.056 |
| Natural Gas | $164,614 | 48,932 |
MMBtu
|
$3.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,809 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,594 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $10,215 | - |
$10,215
183,470
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $524 | - |
$524
9,379
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,890 | $4,906 |
$4,890
87,925
kWh
|
- | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,044 | $6,500 |
$2,751
49,531
kWh
|
$(-707.0)
-
MMBtu
|
|
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,737 | - |
$1,737
31,067
kWh
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,056 | $500 | - |
$8,056
-
MMBtu
|
|
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $18,343 | $6,900 | - |
$18,343
-
MMBtu
|
|
| TOTAL RECOMMENDED | $45,809 | $18,806 |
$20,117
361,372
kWh
|
$25,692
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $35,594 | $18,806 |
$9,902
177,902
kWh
|
$25,692
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs