ITAC Assessment: UW0051
ITAC logo
ITAC Assessment: UW0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Natural Gas
NAICS 486110: Pipeline Transportation of Crude Oil
SIC 4612: Crude Petroleum Pipelines
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 40,000
ft2
Annual Production 500
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,980 7,713,600
kWh
Electricity Demand $3,505 881
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,217 $80,000 $26,665
726,590
kWh
$9,552
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $16,962 $29,807 $14,768
402,525
kWh
$2,194
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,680 $10,004 $5,317
144,746
kWh
$3,363
-
kW-mo/yr
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $4,139 $2,295 $2,258
68,429
kWh
$1,881
-
kW-mo/yr
TOTAL RECOMMENDED $65,998 $122,106 $49,008
1,342,290
kWh
$16,990
-
kW-mo/yr
TOTAL IMPLEMENTED $12,819 $12,299 $7,575
213,175
kWh
$5,244
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs