ITAC Assessment: UW0034
ITAC logo
ITAC Assessment: UW0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Plywood
NAICS 423310: Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers
SIC 5031: Lumber, Plywood, Millwork, and Wood Panels
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 240,000
ft2
Annual Production 20,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,770 11,849,200
kWh
Electricity Demand $122,292 2,450
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $255,181 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
01 2.2122: Install / repair insulation on condensate lines $120,000 - - - $120,000
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $58,639 $102,000 $18,009
586,622
kWh
$35,607
-
kW-mo/yr
- $5,023
03 2.4133: Use most efficient type of electric motors $38,716 - $32,667
1,064,086
kWh
$6,049
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,749 $115,000 $22,570
735,183
kWh
$4,179
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,077 $10,000 $9,549
268,836
kWh
$1,528
-
kW-mo/yr
- -
TOTAL RECOMMENDED $255,181 $227,000 $82,795
2,654,727
kWh
$47,363
-
kW-mo/yr
$120,000
-
MMBtu
$5,023
TOTAL IMPLEMENTED $96,465 $227,000 $50,128
1,590,641
kWh
$41,314
-
kW-mo/yr
- $5,023
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs