ITAC Assessment: UW0031
ITAC logo
ITAC Assessment: UW0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product eyed eggs, fish flesh
NAICS 112511: Finfish Farming and Fish Hatcheries
SIC 921: Courts
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 1,080,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,820 1,622,852
kWh
Other Gas $1,500 28
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $13,928 $19,446 $12,070
186,514
kWh
$1,858
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,305 $6,000 $2,836
43,800
kWh
$10,469
-
kW-mo/yr
03 2.2511: Insulate bare equipment $1,741 $5,500 $1,741
26,895
kWh
-
04 2.2511: Insulate bare equipment $144 $61 $144
2,222
kWh
-
TOTAL RECOMMENDED $29,118 $31,007 $16,791
259,431
kWh
$12,327
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs