ITAC Assessment: UW0010
ITAC logo
ITAC Assessment: UW0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Vinyl windows and patio doors, aluminum windows and patio doors
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 129,600
ft2
Annual Production 1
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,752 3,182,600
kWh
Electricity Demand $47,820 8,064
kW-mo/yr
Electricity Fees $1,358 -
Natural Gas $10,229 800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,846 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,108 $4,160 $10,553
311,710
kWh
$3,555
-
kW-mo/yr
- -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $7,398 $75,533 - - $7,398
-
MMBtu
-
03 2.7232: Replace existing hvac unit with high efficiency model $5,340 $3,000 $2,640
78,000
kWh
- - $2,700
TOTAL RECOMMENDED $26,846 $82,693 $13,193
389,710
kWh
$3,555
-
kW-mo/yr
$7,398
-
MMBtu
$2,700
TOTAL IMPLEMENTED $14,108 $4,160 $10,553
311,710
kWh
$3,555
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs