ITAC Assessment: UU0237
ITAC logo
ITAC Assessment: UU0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Medical equipment
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 221
Plant Area 29,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 5,840
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,556 720,640
kWh
Natural Gas $31,307 2,629
MMBtu
TOTAL YEARLY COSTS $85,863
RECOMMENDED SAVINGS* $35,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $10,990 $184,280 $10,990
144,580
kWh
- -
02 2.7314: Reduce ventilation air $7,109 $28,950 $2,556
33,636
kWh
$4,552
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,340 $23,500 $5,340
70,320
kWh
- -
04 2.6218: Turn off equipment when not in use $6,350 $8,970 $6,350
83,554
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,430 $3,000 $3,430
45,150
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,040 $375 $2,040
26,880
kWh
- -
07 2.8123: Pay utility bills on time $210 $150 - - $210
TOTAL RECOMMENDED $35,469 $249,225 $30,706
404,120
kWh
$4,552
-
MMBtu
$210
TOTAL IMPLEMENTED $33,429 $248,850 $28,666
377,240
kWh
$4,552
-
MMBtu
$210
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs