ITAC Assessment: UU0093
ITAC logo
ITAC Assessment: UU0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product tempura beef, chicken & pork
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 27,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,824 996,065
kWh
Electricity Demand $7,815 2,771
kW-mo/yr
Natural Gas $86,885 10,496
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $358,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
01 4.113: Install refrigeration system to cool product $336,460 $336,000 - - - $336,460 -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $727 $495 $617
18,568
kWh
$110
-
kW-mo/yr
- - -
03 2.2696: Use excess cold process fluid for industrial cooling needs $350 $2,000 $245
7,327
kWh
$105
-
kW-mo/yr
- - -
04 2.8121: Apply for tax-free status for energy purchases $19,080 - - - - - $19,080
05 2.8123: Pay utility bills on time $1,418 - - - - - $1,418
06 2.2511: Insulate bare equipment $777 $2,000 - - $777
-
MMBtu
- -
TOTAL RECOMMENDED $358,812 $340,495 $862
25,895
kWh
$215
-
kW-mo/yr
$777
-
MMBtu
$336,460 $20,498
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs