ITAC Assessment: UU0021
ITAC logo
ITAC Assessment: UU0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Treadmills
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 1,500
Plant Area 470,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 5,030
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $533,846 17,762,456
kWh
Electricity Demand $317,677 2,110
kW-mo/yr
Electricity Fees $51,091 -
Natural Gas $255,285 109,555
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,926

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $4,413 $8,128 $2,500
78,585
kWh
$1,913
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $3,462 $610 - - $3,462
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,467 $460 $3,244
102,067
kWh
$3,223
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $14,706 $18,000 - $14,706
-
kW-mo/yr
- -
05 2.7243: Improve air circulation with destratification fans / other methods $22,256 $31,800 $520
16,337
kWh
$410
-
kW-mo/yr
$21,326
-
MMBtu
-
06 3.5311: Recover and reuse waste material $62,291 $17,100 - - - $62,291
-
lb
TOTAL RECOMMENDED $113,595 $76,098 $6,264
196,989
kWh
$20,252
-
kW-mo/yr
$24,788
-
MMBtu
$62,291
-
lb
TOTAL IMPLEMENTED $86,926 $36,170 $3,244
102,067
kWh
$17,929
-
kW-mo/yr
$3,462
-
MMBtu
$62,291
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs