ITAC Assessment: UM0430
ITAC logo
ITAC Assessment: UM0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Vehicle testing
NAICS 541330: Engineering Services
SIC 8711: Engineering Services
Sales Range $1
M
to 5
M
# of Employees 56
Plant Area 60,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,360 2,262,900
kWh
Natural Gas $14,569 1,754
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4311: Recover mechanical energy $45,000 $8,000 $45,000
348,511
kWh
02 2.4311: Recover mechanical energy $18,100 $15,500 $18,100
140,287
kWh
03 2.4323: Use optimum size and capacity equipment $16,100 $5,500 $16,100
125,160
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,154 $29,153 $6,154
47,781
kWh
TOTAL RECOMMENDED $85,354 $58,153 $85,354
661,739
kWh
TOTAL IMPLEMENTED $6,154 $29,153 $6,154
47,781
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs