ITAC Assessment: UM0148
ITAC logo
ITAC Assessment: UM0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal Fittings
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 25,000
ft2
Annual Production 114,000,000
pieces
Production Hrs. Annual 5,330
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,155 732,122
kWh
Electricity Demand $30,278 2,652
kW-mo/yr
Electricity Fees $3,582 -
Natural Gas $3,494 661
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $369,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,826 $2,464 $1,191
33,998
kWh
$878
-
kW-mo/yr
- - - $70 - $687
02 2.2437: Recover waste heat from equipment $1,069 $500 - - - $1,069
-
MMBtu
- - - -
03 2.8114: Change rate schedules or other changes in utility service $10,056 $40,000 - - $10,056 - - - - -
04 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $12,311 $40,000 - - - - $7,700
-
gal
- $(-1,429.0) $6,040
05 4.511: Expand operations into unused space $342,900 $683,000 - - - - - - $342,900 -
TOTAL RECOMMENDED $369,162 $765,964 $1,191
33,998
kWh
$878
-
kW-mo/yr
$10,056 $1,069
-
MMBtu
$7,700
-
gal
$70 $341,471 $6,727
TOTAL IMPLEMENTED $15,137 $42,464 $1,191
33,998
kWh
$878
-
kW-mo/yr
- - $7,700
-
gal
$70 $(-1,429.0) $6,727
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs