ITAC Assessment: UM0118
ITAC logo
ITAC Assessment: UM0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Avionics
NAICS
n/a
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $50
M
to 100
M
# of Employees 420
Plant Area 110,000
ft2
Annual Production 16,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,101 4,929,660
kWh
Electricity Demand $91,350 12,012
kW-mo/yr
Electricity Fees $22,507 -
Natural Gas $41,033 7,957
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,082 $10,080 $543
18,464
kWh
$1,539
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $523 $900 $523
17,585
kWh
- - - - -
03 3.2121: Convert to electrostatic powder coating $10,970 $6,000 - - - $2,970
-
gal
$5,280
-
lb
$2,720
04 3.3122: Use filtration, centrifuging to remove contaminants $797 $800 - - $797
-
Tgal
- - -
05 4.311: Schedule deliveries according to demand $2,758 - - - - - - $2,758
TOTAL RECOMMENDED $17,130 $17,780 $1,066
36,049
kWh
$1,539
-
kW-mo/yr
$797
-
Tgal
$2,970
-
gal
$5,280
-
lb
$5,478
TOTAL IMPLEMENTED $2,605 $10,980 $1,066
36,049
kWh
$1,539
-
kW-mo/yr
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs