Assessment Year | 2022 |
---|---|
Principal Product | commercial printing, wide format printing, POP displays, graphic designs |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
100,000
ft2
|
Annual Production | 164,836
units
|
Production Hrs. Annual | 6,448
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,416 | 2,069,036 |
kWh
|
$0.076 |
Electricity Demand | $72,190 | 7,082 |
kW-mo/yr
|
$10.19 |
Electricity Fees | $24,420 | - |
|
- |
Natural Gas | $17,648 | 1,781 |
MMBtu
|
$9.91 |
TOTAL YEARLY COSTS | $270,674 | |||
RECOMMENDED SAVINGS* | $113,172 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $25,756 | $6,000 | - | - | $25,756 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,086 | $1,631 |
$2,470
32,495
kWh
|
$616
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,212 | $2,677 |
$2,069
27,221
kWh
|
$1,143
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $2,477 | $4,965 |
$2,477
32,587
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $577 | - |
$577
7,595
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,464 | $1,280 |
$4,464
58,742
kWh
|
- | - | |
07 | 2.9114: Use solar heat to make electricty | $73,600 | $600,732 |
$57,711
759,361
kWh
|
$15,889
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $113,172 | $617,285 |
$69,768
918,001
kWh
|
$17,648
-
kW-mo/yr
|
$25,756 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs