ITAC Assessment: UF0568
ITAC logo
ITAC Assessment: UF0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 344,000
ft2
Annual Production 2,100,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $346,135 5,866,700
kWh
Electricity Demand $91,836 15,306
kW-mo/yr
Electricity Fees $6,817 -
TOTAL YEARLY COSTS $444,788
RECOMMENDED SAVINGS* $1,779,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,101

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings By-product Production Savings
01 2.4323: Use optimum size and capacity equipment $52,474 $147,852 $41,127
697,073
kWh
$11,347
-
kW-mo/yr
- - - -
02 2.4112: Install soft-start to eliminate nuisance trips $20,147 $49,165 $20,147
341,473
kWh
- - - - -
03 2.4133: Use most efficient type of electric motors $11,182 $12,247 $8,997
152,496
kWh
$2,185
-
kW-mo/yr
- - - -
04 2.5195: Change product design to reduce energy requirements $8,146 $700 $8,146
138,060
kWh
- - - - -
05 2.7135: Install occupancy sensors $3,117 $9,240 $3,117
52,838
kWh
- - - - -
06 2.5121: Redesign flow to minimize mass transfer length $1,828 - $1,828
30,979
kWh
- - - - -
07 3.5217: Reuse / recycle/ sell paper products $1,670,260 $53,000 $(-18,761.0)
(-317,988)
kWh
$(-2,614.0)
-
kW-mo/yr
$(-80,424.0)
-
MMBtu
- - $1,772,059
08 3.6192: Use a less expensive method of waste removal $8,760 $8,000 - - - $8,760 - -
09 4.662: Level one – add communication using iiot devices to existing control system to modify operations $3,655 - - - - - $3,655 -
TOTAL RECOMMENDED $1,779,569 $280,204 $64,601
1,094,931
kWh
$10,918
-
kW-mo/yr
$(-80,424.0)
-
MMBtu
$8,760 $3,655 $1,772,059
TOTAL IMPLEMENTED $38,101 $70,652 $32,261
546,807
kWh
$2,185
-
kW-mo/yr
- - $3,655 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs