| Assessment Year | 2021 |
|---|---|
| Principal Product | Wastewater Treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 15 |
| Plant Area |
344,000
ft2
|
| Annual Production | 2,100,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $346,135 | 5,866,700 |
kWh
|
$0.059 |
| Electricity Demand | $91,836 | 15,306 |
kW-mo/yr
|
$6.00 |
| Electricity Fees | $6,817 | - |
|
- |
| TOTAL YEARLY COSTS | $444,788 | |||
| RECOMMENDED SAVINGS* | $1,779,569 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $38,101 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $52,474 | $147,852 |
$41,127
697,073
kWh
|
$11,347
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4112: Install soft-start to eliminate nuisance trips | $20,147 | $49,165 |
$20,147
341,473
kWh
|
- | - | - | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $11,182 | $12,247 |
$8,997
152,496
kWh
|
$2,185
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.5195: Change product design to reduce energy requirements | $8,146 | $700 |
$8,146
138,060
kWh
|
- | - | - | - | - | |
| 05 | 2.7135: Install occupancy sensors | $3,117 | $9,240 |
$3,117
52,838
kWh
|
- | - | - | - | - | |
| 06 | 2.5121: Redesign flow to minimize mass transfer length | $1,828 | - |
$1,828
30,979
kWh
|
- | - | - | - | - | |
| 07 | 3.5217: Reuse / recycle/ sell paper products | $1,670,260 | $53,000 |
$(-18,761.0)
(-317,988)
kWh
|
$(-2,614.0)
-
kW-mo/yr
|
$(-80,424.0)
-
MMBtu
|
- | - | $1,772,059 | |
| 08 | 3.6192: Use a less expensive method of waste removal | $8,760 | $8,000 | - | - | - | $8,760 | - | - | |
| 09 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $3,655 | - | - | - | - | - | $3,655 | - | |
| TOTAL RECOMMENDED | $1,779,569 | $280,204 |
$64,601
1,094,931
kWh
|
$10,918
-
kW-mo/yr
|
$(-80,424.0)
-
MMBtu
|
$8,760 | $3,655 | $1,772,059 | ||
| TOTAL IMPLEMENTED | $38,101 | $70,652 |
$32,261
546,807
kWh
|
$2,185
-
kW-mo/yr
|
- | - | $3,655 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs