ITAC Assessment: UF0545
ITAC logo
ITAC Assessment: UF0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Reclaimed Water and Bio-Solids
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 24
Plant Area 767,250
ft2
Annual Production 7,439,700
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,063,061 16,988,917
kWh
TOTAL YEARLY COSTS $1,063,061
RECOMMENDED SAVINGS* $128,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $128,672

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $67,090 $20,230 $67,090
1,073,441
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $51,046 $88,272 $51,046
816,732
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,536 - $9,929
158,869
kWh
$359 $248
TOTAL RECOMMENDED $128,672 $108,502 $128,065
2,049,042
kWh
$359 $248
TOTAL IMPLEMENTED $128,672 $108,502 $128,065
2,049,042
kWh
$359 $248
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs