ITAC Assessment: UF0346
ITAC logo
ITAC Assessment: UF0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Precision Sheet, Plate and Metal Fabrication
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 18,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,899 252,312
kWh
Electricity Demand $8,711 1,464
kW-mo/yr
Natural Gas $72,801 5,287
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $12,968 $5,044 - - $12,968
-
MMBtu
-
02 2.7145: Install skylights $3,241 $8,578 $3,360
30,511
kWh
- - $(-119.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $908 $5,504 $651
9,168
kWh
$257
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $942 $210 $620
8,736
kWh
$322
-
kW-mo/yr
- -
05 3.2173: Convert to robotic painting $24,976 $124,000 - - - $24,976
TOTAL RECOMMENDED $43,035 $143,336 $4,631
48,415
kWh
$579
-
kW-mo/yr
$12,968
-
MMBtu
$24,857
TOTAL IMPLEMENTED $1,850 $5,714 $1,271
17,904
kWh
$579
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs