ITAC Assessment: UF0296
ITAC logo
ITAC Assessment: UF0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Cement Products
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 18
Plant Area 600,000
ft2
Annual Production 19,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,975 4,397,400
kWh
Electricity Demand $33,224 11,214
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,078

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,883 $7,110 $3,082
61,631
kWh
$801
-
kW-mo/yr
- - - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $10,820 $15,547 $7,245
144,908
kWh
$3,770
-
kW-mo/yr
- - $(-195.0) -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,012 $230 $2,084
34,736
kWh
- - - $(-72.0) -
04 2.4133: Use most efficient type of electric motors $8,442 $10,641 $5,600
111,994
kWh
$2,842
-
kW-mo/yr
- - - -
05 2.3112: Store heated/ cooled water for use during peak demand periods $13,799 $202,500 - - - - - $13,799
06 3.4155: Meter waste water $1,066 $1,700 - - $1,066
-
gal
- - -
07 3.5248: Separate and recycle scrap metal to foundry or for sale $728 - - - - $728
-
lb
- -
TOTAL RECOMMENDED $40,750 $237,728 $18,011
353,269
kWh
$7,413
-
kW-mo/yr
$1,066
-
gal
$728
-
lb
$(-267.0) $13,799
TOTAL IMPLEMENTED $3,078 $1,930 $2,084
34,736
kWh
- $1,066
-
gal
- $(-72.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs