ITAC Assessment: UF0253
ITAC logo
ITAC Assessment: UF0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Metal Enclosures
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 51,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,532 1,414,420
kWh
Electricity Demand $33,709 3,648
kW-mo/yr
Natural Gas $28,945 4,973
MMBtu
LPG $2,477 128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,449 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $11,845 $50 n/a - - - - - $11,845
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,873 $2,282 n/a $5,834
129,543
kWh
$2,039
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $2,296 $695 n/a $2,296
38,394
kWh
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,166 $320 n/a $3,166
29,894
kWh
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,643 - n/a $1,643
23,740
kWh
- - - - -
06 2.2511: Insulate bare equipment $3,090 $690 n/a - - - - - $3,090
07 3.5217: Reuse / recycle/ sell paper products $293 - n/a - - - $293
-
lb
- -
08 4.652: Replace existing equipment with more suitable substitutes $565 $520 n/a - - - - $565 -
09 2.2221: Use immersion heating in tanks, melting pots, etc $10,678 $25,000 n/a - - $10,678
-
MMBtu
- - -
TOTAL RECOMMENDED $41,449 $29,557 $12,939
221,571
kWh
$2,039
-
kW-mo/yr
$10,678
-
MMBtu
$293
-
lb
$565 $14,935
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs