ITAC Assessment: UF0213
ITAC logo
ITAC Assessment: UF0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Corrugated Shipping Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 265,000
ft2
Annual Production 54,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,570 8,878,371
kWh
Electricity Demand $28,198 18,070
kW-mo/yr
Natural Gas $260,248 65,734
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,516 $16,781 $7,189
152,989
kWh
$327
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,297 $5,022 $4,967
127,491
kWh
$330
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,712 $6,927 $3,481
89,390
kWh
$231
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $785 $1,137 $733
18,757
kWh
$52
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,738 $2,600 $13,138
312,720
kWh
- - $(-2,400.0)
06 2.2135: Repair and eliminate steam leaks $23,988 $2,300 - - $26,288
-
MMBtu
$(-2,300.0)
07 2.2414: Use waste heat from hot flue gases to preheat $18,852 $39,600 - - $18,852
-
MMBtu
-
08 3.6121: Burn waste paper for heat $18,145 $90,000 - - $18,145
-
MMBtu
-
09 3.4116: Meter recycled water (to reduce sewer charges) $1,089 $1,500 - - - $1,089
10 4.812: Apply for investment incentives $21,947 $50 - - - $21,947
TOTAL RECOMMENDED $112,069 $165,917 $29,508
701,347
kWh
$940
-
kW-mo/yr
$63,285
-
MMBtu
$18,336
TOTAL IMPLEMENTED $36,801 $24,103 $12,156
280,480
kWh
$657
-
kW-mo/yr
$26,288
-
MMBtu
$(-2,300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs