ITAC Assessment: UF0212
ITAC logo
ITAC Assessment: UF0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Manufactured homes
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $50
M
to 100
M
# of Employees 700
Plant Area 285,000
ft2
Annual Production 2,500
pieces
Production Hrs. Annual 2,772
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,103 1,563,892
kWh
Electricity Demand $69,957 8,442
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $506,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,697

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,912 $4,901 $1,563
37,222
kWh
$1,349
-
kW-mo/yr
-
02 2.7131: Add area lighting switches $2,592 $1,614 $2,592
74,443
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,198 $1,438 $7,198
97,011
kWh
- -
04 2.4238: Do not use compressed air for personal cooling $1,314 $1,818 $1,314
15,240
kWh
- -
05 3.1192: Reduce scrap production $74,273 $165,000 - - $74,273
06 4.431: Train operators for maximum operating efficiency $241,992 $1,794 $72
25,791
kWh
- $241,920
07 4.131: Modify process to reduce material use/cost $176,631 $34,209 - - $176,631
TOTAL RECOMMENDED $506,912 $210,774 $12,739
249,707
kWh
$1,349
-
kW-mo/yr
$492,824
TOTAL IMPLEMENTED $85,697 $173,157 $10,075
149,473
kWh
$1,349
-
kW-mo/yr
$74,273
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs