ITAC Assessment: UF0204
ITAC logo
ITAC Assessment: UF0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Juice Products
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 142,283
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $887,518 21,898,300
kWh
Electricity Demand $92,817 42,836
kW-mo/yr
Natural Gas $77,385 13,863
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $104,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,991 $5,652 $1,820
44,256
kWh
$171
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $1,088 $792 $984
24,033
kWh
$104
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $4,777 $4,604 $4,400
107,268
kWh
$377
-
kW-mo/yr
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $980 $1,000 $980
51,290
kWh
- - -
05 2.5113: Use direct flame impingement or infrared processing for chamber type heating $46,067 $116,000 $63,860
1,557,444
kWh
$5,755
-
kW-mo/yr
$(-23,548.0)
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,919 $1,200 $16,919
376,026
kWh
- - -
07 3.6192: Use a less expensive method of waste removal $1,380 - - - - $1,380
08 3.1291: Eliminate practice of mixing waste streams $28,601 $2,500 - - - $28,601
09 4.111: Add equipment/ operators to reduce production bottleneck $3,000 $4,000 - - - $3,000
TOTAL RECOMMENDED $104,803 $135,748 $88,963
2,160,317
kWh
$6,407
-
kW-mo/yr
$(-23,548.0)
-
MMBtu
$32,981
TOTAL IMPLEMENTED $65,957 $123,852 $83,579
2,029,016
kWh
$5,926
-
kW-mo/yr
$(-23,548.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs