ITAC Assessment: UF0196
ITAC logo
ITAC Assessment: UF0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Particle Boards & Wood Veneers
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 116
Plant Area 800,000
ft2
Annual Production 14,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,921 6,188,160
kWh
Electricity Demand $92,568 18,514
kW-mo/yr
Wood $62,400 41,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,043 $6,801 $1,689
27,550
kWh
$354
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,297 $2,257 $2,913
47,773
kWh
$384
-
kW-mo/yr
- -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $586 $155 $586
9,672
kWh
- - -
04 2.4133: Use most efficient type of electric motors $1,682 $2,883 $1,372
22,567
kWh
$310
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,030 $4,425 $3,030
49,531
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,256 $1,600 $8,256
135,404
kWh
- - -
07 2.4323: Use optimum size and capacity equipment $1,662 - - $1,662
-
kW-mo/yr
- -
08 2.2136: Install / repair insulation on steam lines $4,198 $3,500 - - $4,198
-
MMBtu
-
09 3.4131: Minimize contamination of water before treatment $6,952 $30,000 - - - $6,952
10 3.6192: Use a less expensive method of waste removal $2,400 - - - - $2,400
11 4.452: Eliminate shift $18,278 - - - - $18,278
TOTAL RECOMMENDED $52,384 $51,621 $17,846
292,497
kWh
$2,710
-
kW-mo/yr
$4,198
-
MMBtu
$27,630
TOTAL IMPLEMENTED $16,851 $11,320 $16,157
264,947
kWh
$694
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs