Assessment Year | 1998 |
---|---|
Principal Product | Particle Boards & Wood Veneers |
NAICS |
n/a
|
SIC | 2493: Reconstituted Wood Products |
Sales Range | $10 M to 50M |
# of Employees | 116 |
Plant Area |
800,000
ft2
|
Annual Production | 14,000
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $379,921 | 6,188,160 |
kWh
|
$0.061 |
Electricity Demand | $92,568 | 18,514 |
kW-mo/yr
|
$5.00 |
Wood | $62,400 | 41,600 |
MMBtu
|
$1.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,851 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,043 | $6,801 |
$1,689
27,550
kWh
|
$354
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,297 | $2,257 |
$2,913
47,773
kWh
|
$384
-
kW-mo/yr
|
- | - | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $586 | $155 |
$586
9,672
kWh
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,682 | $2,883 |
$1,372
22,567
kWh
|
$310
-
kW-mo/yr
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,030 | $4,425 |
$3,030
49,531
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,256 | $1,600 |
$8,256
135,404
kWh
|
- | - | - | |
07 | 2.4323: Use optimum size and capacity equipment | $1,662 | - | - |
$1,662
-
kW-mo/yr
|
- | - | |
08 | 2.2136: Install / repair insulation on steam lines | $4,198 | $3,500 | - | - |
$4,198
-
MMBtu
|
- | |
09 | 3.4131: Minimize contamination of water before treatment | $6,952 | $30,000 | - | - | - | $6,952 | |
10 | 3.6192: Use a less expensive method of waste removal | $2,400 | - | - | - | - | $2,400 | |
11 | 4.452: Eliminate shift | $18,278 | - | - | - | - | $18,278 | |
TOTAL RECOMMENDED | $52,384 | $51,621 |
$17,846
292,497
kWh
|
$2,710
-
kW-mo/yr
|
$4,198
-
MMBtu
|
$27,630 | ||
TOTAL IMPLEMENTED | $16,851 | $11,320 |
$16,157
264,947
kWh
|
$694
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs