Assessment Year | 1994 |
---|---|
Principal Product | Oil & water-based products |
NAICS |
n/a
|
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
100,000
ft2
|
Annual Production | 100,000,000
lb
|
Production Hrs. Annual | 8,700
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,096 | 1,123,681 |
kWh
|
$0.073 |
Natural Gas | $83,333 | 20,867 |
MMBtu
|
$3.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,041 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,286 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,528 | $706 |
$1,528
20,809
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $467 | $1,456 |
$467
6,155
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $238 | $320 |
$238
2,638
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $3,591 | $4,728 |
$3,591
47,773
kWh
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $1,906 | $5,200 | - |
$1,906
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,509 | $22,500 |
$6,509
125,147
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $102 | $128 |
$102
2,052
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $2,700 | $2,700 | - |
$2,700
-
MMBtu
|
|
TOTAL RECOMMENDED | $17,041 | $37,738 |
$12,435
204,574
kWh
|
$4,606
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,286 | $9,590 |
$5,586
74,737
kWh
|
$2,700
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs