ITAC Assessment: UF0105
ITAC logo
ITAC Assessment: UF0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Oil & water-based products
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,700
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,096 1,123,681
kWh
Natural Gas $83,333 20,867
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,286

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,528 $706 $1,528
20,809
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $467 $1,456 $467
6,155
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $238 $320 $238
2,638
kWh
-
04 2.4133: Use most efficient type of electric motors $3,591 $4,728 $3,591
47,773
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $1,906 $5,200 - $1,906
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,509 $22,500 $6,509
125,147
kWh
-
07 2.7135: Install occupancy sensors $102 $128 $102
2,052
kWh
-
08 2.2511: Insulate bare equipment $2,700 $2,700 - $2,700
-
MMBtu
TOTAL RECOMMENDED $17,041 $37,738 $12,435
204,574
kWh
$4,606
-
MMBtu
TOTAL IMPLEMENTED $8,286 $9,590 $5,586
74,737
kWh
$2,700
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs