| Assessment Year | 1994 |
|---|---|
| Principal Product | PLASTIC INJECTION PARTS |
| NAICS |
n/a
|
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
38,000
ft2
|
| Annual Production | 10,000,000
lb
|
| Production Hrs. Annual | 7,448
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $543,591 | 7,924,385 |
kWh
|
$0.069 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,685 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,887 | $861 |
$5,887
85,287
kWh
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,474 | $2,402 |
$1,474
21,395
kWh
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $1,767 | - |
$1,767
25,498
kWh
|
|
| 04 | 2.7144: Install spectral reflectors / delamp | $529 | $888 |
$529
6,448
kWh
|
|
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $3,106 | $4,950 |
$3,106
45,135
kWh
|
|
| 06 | 2.2622: Replace existing chiller with high efficiency model | $15,128 | $40,000 |
$15,128
219,226
kWh
|
|
| 07 | 2.4133: Use most efficient type of electric motors | $4,114 | $4,373 |
$4,114
59,496
kWh
|
|
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,061 | $1,150 |
$5,061
73,271
kWh
|
|
| 09 | 2.2511: Insulate bare equipment | $6,510 | $2,800 |
$6,510
94,373
kWh
|
|
| 10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,908 | $12,000 |
$4,908
114,009
kWh
|
|
| TOTAL RECOMMENDED | $48,484 | $69,424 |
$48,484
744,138
kWh
|
||
| TOTAL IMPLEMENTED | $15,685 | $8,323 |
$15,685
227,140
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs