Assessment Year | 1994 |
---|---|
Principal Product | Frozen Seafood |
NAICS |
n/a
|
SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
150,000
ft2
|
Annual Production | 120,000
lb
|
Production Hrs. Annual | 3,800
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $632,054 | 9,672,040 |
kWh
|
$0.065 |
Natural Gas | $42,894 | 7,661 |
MMBtu
|
$5.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,577 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,157 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $3,450 | - |
$3,450
-
kWh
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $9,296 | $19,877 |
$9,296
144,197
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,852 | $951 |
$6,852
134,818
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,351 | $8,499 |
$2,351
42,204
kWh
|
- | |
05 | 2.7144: Install spectral reflectors / delamp | $8,930 | $9,403 |
$8,930
133,060
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $379 | $720 |
$379
6,155
kWh
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $5,278 | $4,190 |
$5,278
116,940
kWh
|
- | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $738 | $1,000 | - |
$738
-
MMBtu
|
|
09 | 2.2447: Heat water with exhaust heat | $5,098 | $1,800 |
$5,098
79,132
kWh
|
- | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $21,205 | $75,000 |
$21,205
-
kWh
|
- | |
TOTAL RECOMMENDED | $63,577 | $121,440 |
$62,839
656,506
kWh
|
$738
-
MMBtu
|
||
TOTAL IMPLEMENTED | $36,157 | $42,920 |
$36,157
571,219
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs