Assessment Year | 1994 |
---|---|
Principal Product | Corrugated boxes and sheets |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
194,000
ft2
|
Annual Production | 504,000,000
pieces
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $240,181 | 3,356,389 |
kWh
|
$0.072 |
Natural Gas | $137,064 | 32,412 |
MMBtu
|
$4.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,647 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,091 | $3,937 |
$3,091
42,790
kWh
|
- | |
02 | 2.7144: Install spectral reflectors / delamp | $2,567 | $3,210 |
$2,567
33,705
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $4,105 | $4,519 |
$4,105
57,151
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,382 | $1,000 |
$1,382
19,050
kWh
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,781 | $1,000 | - |
$4,781
-
MMBtu
|
|
06 | 2.2414: Use waste heat from hot flue gases to preheat | $3,774 | $2,600 | - |
$3,774
-
MMBtu
|
|
07 | 2.2136: Install / repair insulation on steam lines | $851 | $610 | - |
$851
-
MMBtu
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,223 | $23,300 |
$10,223
173,212
kWh
|
- | |
09 | 2.2135: Repair and eliminate steam leaks | $1,670 | $220 | - |
$1,670
-
MMBtu
|
|
TOTAL RECOMMENDED | $32,444 | $40,396 |
$21,368
325,908
kWh
|
$11,076
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,647 | $9,676 |
$7,196
99,941
kWh
|
$6,451
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs