ITAC Assessment: UF0040
ITAC logo
ITAC Assessment: UF0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC BOTTLES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 66,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,996 6,457,503
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,583 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,040 $365 $3,040
48,945
kWh
02 2.7144: Install spectral reflectors / delamp $7,069 $10,950 $7,069
114,009
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $434 $1,949 $434
7,034
kWh
04 2.7229: Air condition only space necessary $548 $1,000 $548
8,792
kWh
05 2.7233: Use properly designed and sized hvac equipment $1,228 $6,425 $1,228
19,930
kWh
06 2.2621: Modify refrigeration system to operate at a lower pressure $4,115 $17,600 $4,115
66,237
kWh
07 2.4133: Use most efficient type of electric motors $3,149 $14,859 $3,149
50,703
kWh
TOTAL RECOMMENDED $19,583 $53,148 $19,583
315,650
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs