ITAC Assessment: UD1001
ITAC logo
ITAC Assessment: UD1001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Automotive Fasteners
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 44,750
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,926 596,077
kWh
Electricity Demand $7,730 2,112
kW-mo/yr
Electricity Fees $309 -
Natural Gas $18,486 2,483
MMBtu
Waste Disposal Costs
Water Usage $1,106 99
Tgal
Water Disposal $3,673 99
Tgal
TOTAL YEARLY COSTS $71,230
RECOMMENDED SAVINGS* $17,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,487

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,285 $4,400 $2,825
41,852
kWh
$460
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $705 $1,200 $916
13,565
kWh
$149
-
kW-mo/yr
$(-360.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,497 $16,508 $11,056
163,720
kWh
$1,796
-
kW-mo/yr
$645
TOTAL RECOMMENDED $17,487 $22,108 $14,797
219,137
kWh
$2,405
-
kW-mo/yr
$285
TOTAL IMPLEMENTED $17,487 $22,108 $14,797
219,137
kWh
$2,405
-
kW-mo/yr
$285
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs