Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Thermoset Composites
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 300,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $825,677 13,855,971
kWh
Electricity Demand $70,623 28,944
kW-mo/yr
Electricity Fees $94,902 -
Natural Gas $59,528 5,563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $326,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3511: Use plant owned transformers or lease transformers $10,632 $80,000 - - - $10,632
02 2.3212: Optimize plant power factor $6,480 $60,000 - - - $6,480
03 2.7142: Utilize higher efficiency lamps and/or ballasts $29,001 $79,437 $24,985
419,285
kWh
$2,499
-
kW-mo/yr
- $1,517
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,108 $14,100 $6,021
101,040
kWh
$602
-
kW-mo/yr
- $485
05 2.6212: Turn off equipment during breaks, reduce operating time $120,105 - $116,230
1,950,500
kWh
$3,875
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,143 - $948
15,907
kWh
$195
-
kW-mo/yr
- -
07 2.4133: Use most efficient type of electric motors $101,273 $58,500 $96,174
1,613,923
kWh
$5,099
-
kW-mo/yr
- -
08 2.4133: Use most efficient type of electric motors $1,705 $3,600 $1,705
28,608
kWh
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,587 $1,100 $5,988
100,488
kWh
$599
-
kW-mo/yr
- -
10 2.2511: Insulate bare equipment $6,356 $946 - - $6,356
-
MMBtu
-
11 2.1233: Analyze flue gas for proper air/fuel ratio $1,958 - - - $1,958
-
MMBtu
-
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $988 $3,250 $988
16,586
kWh
- - -
13 2.9114: Use solar heat to make electricty $33,106 $294,000 $11,987
201,153
kWh
- - $21,119
TOTAL RECOMMENDED $326,442 $594,933 $265,026
4,447,490
kWh
$12,869
-
kW-mo/yr
$8,314
-
MMBtu
$40,233
TOTAL IMPLEMENTED $30,959 $79,437 $24,985
419,285
kWh
$2,499
-
kW-mo/yr
$1,958
-
MMBtu
$1,517
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs