ITAC Assessment: UD0840
ITAC logo
ITAC Assessment: UD0840
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product MRI Coils
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 72,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 3,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,902 1,770,560
kWh
Electricity Demand $25,346 3,922
kW-mo/yr
Natural Gas $21,285 2,399
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $1,586 $1,463 $1,586
15,840
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,128 $900 $1,016
12,887
kWh
$112
-
kW-mo/yr
-
03 2.6212: Turn off equipment during breaks, reduce operating time $1,056 - $1,056
13,384
kWh
- -
04 2.7135: Install occupancy sensors $607 $300 $447
5,661
kWh
- $160
05 2.6211: Conserve energy by efficient use of vending machines $456 $998 $456
5,779
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $276 $25 $227
2,881
kWh
$49
-
kW-mo/yr
-
TOTAL RECOMMENDED $5,109 $3,686 $4,788
56,432
kWh
$161
-
kW-mo/yr
$160
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs