| Assessment Year | 2007 |
|---|---|
| Principal Product | Laminated fiberglass Truck caps and lids |
| NAICS | 336214: Travel Trailer and Camper Manufacturing |
| SIC | 3792: Travel Trailers and Campers |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
204,000
ft2
|
| Annual Production | 87,600
pieces
|
| Production Hrs. Annual | 5,100
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $429,469 | 6,687,200 |
kWh
|
$0.064 |
| Natural Gas | $697,454 | 64,614 |
MMBtu
|
$10.79 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $202,702 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $71,112 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $101,033 | $243,645 | - | - | - |
$101,033
-
MMBtu
|
- | |
| 02 | 2.2511: Insulate bare equipment | $35,952 | $98,336 | - | - | - |
$35,952
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,818 | $49,600 |
$7,745
276,624
kWh
|
$16,396
-
kW-mo/yr
|
- | - | $677 | |
| 04 | 2.3212: Optimize plant power factor | $24,334 | $6,000 | - | - | $24,334 | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,675 | $1,275 |
$1,652
58,650
kWh
|
$3,023
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7495: Install replacement doors | $6,223 | $13,000 | - | - | - |
$6,223
-
MMBtu
|
- | |
| 07 | 2.7135: Install occupancy sensors | $3,230 | $760 |
$3,230
104,193
kWh
|
- | - | - | - | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,437 | - |
$868
28,002
kWh
|
$1,569
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $202,702 | $412,616 |
$13,495
467,469
kWh
|
$20,988
-
kW-mo/yr
|
$24,334 |
$143,208
-
MMBtu
|
$677 | ||
| TOTAL IMPLEMENTED | $71,112 | $149,971 |
$13,495
467,469
kWh
|
$20,988
-
kW-mo/yr
|
- |
$35,952
-
MMBtu
|
$677 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs