Assessment Year | 2007 |
---|---|
Principal Product | Wood Fixtures for Retail |
NAICS | 337212: Custom Architectural Woodwork and Millwork Manufacturing |
SIC | 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
230,000
ft2
|
Annual Production | 600
thousand feet
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $151,737 | 2,194,459 |
kWh
|
$0.069 |
Natural Gas | $85,262 | 6,868 |
MMBtu
|
$12.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,707 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,185 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $11,130 | - | - | - |
$11,130
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,549 | $40,500 |
$3,448
118,918
kWh
|
$5,746
-
kW-mo/yr
|
- | $355 | |
03 | 2.6218: Turn off equipment when not in use | $7,675 | - |
$1,302
44,885
kWh
|
$2,504
-
kW-mo/yr
|
$3,869
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,276 | - | - | - |
$3,276
-
MMBtu
|
- | |
05 | 2.7124: Make a practice of turning off lights when not needed | $1,440 | - |
$1,149
13
kWh
|
- | - | $291 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $664 | $500 |
$249
8,580
kWh
|
$415
-
kW-mo/yr
|
- | - | |
07 | 2.1231: Establish burner maintenance schedule for boilers | $534 | - | - | - |
$534
-
MMBtu
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $266 | - |
$100
3,432
kWh
|
$166
-
kW-mo/yr
|
- | - | |
09 | 2.7221: Lower temperature during the winter season and vice-versa | $173 | - | - | - |
$173
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $34,707 | $41,000 |
$6,248
175,828
kWh
|
$8,831
-
kW-mo/yr
|
$18,982
-
MMBtu
|
$646 | ||
TOTAL IMPLEMENTED | $24,185 | $500 |
$2,700
53,478
kWh
|
$2,919
-
kW-mo/yr
|
$18,275
-
MMBtu
|
$291 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs