ITAC Assessment: UD0573
ITAC logo
ITAC Assessment: UD0573
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aluminum castings
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 175,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 3,920
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,815 12,512,017
kWh
Electricity Demand $341,359 24,348
kW-mo/yr
Natural Gas $362,868 111,686
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $449,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $407,265

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $238,622 - - - - - $219,872 $18,750 -
02 3.5221: Recycle casting sand $159,120 $310,000 $3,213
152,989
kWh
$15,007
-
kW-mo/yr
- - $65,300 - $75,600
03 2.2442: Preheat combustion air with waste heat $30,590 $30,500 - - $30,590
-
MMBtu
- - - -
04 2.2437: Recover waste heat from equipment $10,431 $6,000 $1,574
75,029
kWh
$3,197
-
kW-mo/yr
$7,426
-
MMBtu
- $(-1,766.0) - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,523 $14,669 $4,459
212,485
kWh
$5,064
-
kW-mo/yr
- - - - -
06 3.4153: Use counter current rinsing to reduce waste water $1,294 $200 - - - $1,294
-
Tgal
- - -
TOTAL RECOMMENDED $449,580 $361,369 $9,246
440,503
kWh
$23,268
-
kW-mo/yr
$38,016
-
MMBtu
$1,294
-
Tgal
$283,406 $18,750 $75,600
TOTAL IMPLEMENTED $407,265 $324,669 $7,672
365,474
kWh
$20,071
-
kW-mo/yr
- - $285,172 $18,750 $75,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs